• Metrostudio

Metrostudio Design

Share Germany Metrostudio Architecture Trip标签: Building

Interims Audimax by Deubzer Konig & Rimmel Architekten

Project Info >
Interims Audimax by Deubzer Konig & Rimmel Architekten with a construction area of 1010 m2 is situated north of the mathematics and computer science department of the Technical University Munich, Campus Garching. The new lecture hall will be a temporary solution for 10-20 years to solve the lack of space. The very limited budget and a very short planning and building period (approximately 9 months) made the decision to use a wooden structure easy. The primary structure is filled with a wooden frame construction based on a 62,5cm grid. The almost square building contains two lecture halls with 479 and 288 seats. They are separated by a corridor which provides the access for handicapped people and the speaker. The foyer, the bathrooms and the technical facilities are situated below the seating. This assured a maximum of seats within a minimum of cubature. The main accesses for the lecture halls are the two staircases and the first floor corridor. The facade consists of rough cut spruce planks. To counter the varying exposure to the weather and given the short time of service, the decision was made to coat the facade in black wood stain, so that the aging process is not visible. By offsetting the facade’s substructure by one module the image of an undulating surface is created, which is shaped by the light.

Competitive Recommend

  • Pinakothek der Moderne
  • One Central Park
  • The Top 5 Milan Expo Pavilions
  • Metrostudio Design Trip- Platform Design of Casa Batlló
  • The Museum for Argo designed by Not A Number Architect
  • The Museum for Contemporary Art, Barcelona